Vulcan Street

Client

PD Ports

Category

Commercial EV Charging

Close

Get in Touch

Want to know what we can do for you? Please use this form to contact our team.

This field is for validation purposes and should be left unchanged.

Or contact us directly

UCS Icons01642 242567

UCS Iconsinfo@ucs-technologies.com

Client Background

PD Ports are one of the UK’s largest port groups operating over 13 locations throughout the United Kingdom.

The Teesport location assists with international import and export movements from the North of England.

The Challenge

PD Teesport required the installation of electric vehicle chargers to service employee and client transport.

Due to the nature of the charger placement and ground conditions, a wall-mounted bracket was chosen by the client in place of a stand-alone pole.

What UCS Renewables Did

UCS Renewables provided quotes for the project and we installed four EVBOX Business Line 7.4kW electric vehicle chargers with wall-mounted brackets. We also quoted and arranged for an annual invasive test to be conducted for each charger to ensure maximum performance.

Key Features:

  • 4 x EVBOX Business Line 7.4kW Electric Vehicle Chargers
  • Type 1 to Type 2 Charging Leads
  • Wall-Mounted Brackets
  • Annual Invasive Maintenance Plan

Get in Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567.

Or complete the form to contact UCS Renewables and we’ll get right back to you.

This field is for validation purposes and should be left unchanged.

Case Studies

Scout Hut, Bo’Ness – Charity Install

The Scout Hut were looking to achieve carbon neutrality. UCS Renewables technical team completed the Solar PV installation within three days across two elevations.

View

Greenbank, Hartlepool

UCS Renewables completed surveys of the building in addition to reviewing the provided energy efficiency report, to conclude that the roof was suitable for the installation of solar modules. A proposal was approved for SMEES funding for the installation of a 38kW array on a single flat roof.

View

Gateshead MSCP

Our Energy team worked with the provided drawings from McNally & Thompson to compile a suitable design to maximise the use of the available space and optimise solar generation. The installation was challenging as rising energy bills created a surge for solar installations increasing the strain of the supply chain and therefore reducing availability of required materials.

View