Lancaster & Morecambe College – EV Charging

Client

Lancaster & Morecambe College

Category

Commercial EV Charging

Close

Get in Touch

Want to know what we can do for you? Please use this form to contact our team.

This field is for validation purposes and should be left unchanged.

Or contact us directly

UCS Icons01642 242567

UCS Iconsinfo@ucs-technologies.com

Client Background

Lancaster Morecambe College offers part-time and full-time courses to school leavers and adult learners, their curriculum is made up of technical and creative courses to aid their student’s progression into employment. Alongside their campus-based courses, the college offers apprenticeships in 30 different sectors. The college is part of the CPC, a framework designed to connect educational establishments to installers of various equipment, in this instance the college had a need for electric vehicle chargers to offer charging sessions to their staff, students and visitors.

The Challenge

Alongside the active charging pedestals, the college requested the installation of an electric vehicle training board to showcase to their electrical students how both single and three-phase chargers are wired. The board needed to show the key elements of an EV installation so that students could view a non-live system and be hands-on with their learning. A visual aide such as a training board would assist their learning in wiring the chargers correctly and learning how to safely install vehicle charging points. The live chargers which would service the college’s car park needed to have a back management portal that would allow the units to be monitored remotely. This made Rolec Quantum chargers the preferred charger as they are robust for the installation location and offered a Rolec partnered back office to monitor charging sessions, charger use, payments and more.

What UCS Renewables Did

Working alongside the college, UCS Renewables were able to design and install a training board to feature a distribution board, generation meter, isolation switches, and two Rolec chargers: one 7kW (single phase) and the second 22kw (three phases).

We installed two dual Rolec Quantum chargers in the college’s car park, the chargers featured a QR code on each socket to allow users to scan to install an app. These chargers are now visible to staff, students and visitors.

Get in Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567.

Or complete the form to contact UCS Renewables and we’ll get right back to you.

This field is for validation purposes and should be left unchanged.

Case Studies

Scout Hut, Bo’Ness – Charity Install

The Scout Hut were looking to achieve carbon neutrality. UCS Renewables technical team completed the Solar PV installation within three days across two elevations.

View

Greenbank, Hartlepool

UCS Renewables completed surveys of the building in addition to reviewing the provided energy efficiency report, to conclude that the roof was suitable for the installation of solar modules. A proposal was approved for SMEES funding for the installation of a 38kW array on a single flat roof.

View

Gateshead MSCP

Our Energy team worked with the provided drawings from McNally & Thompson to compile a suitable design to maximise the use of the available space and optimise solar generation. The installation was challenging as rising energy bills created a surge for solar installations increasing the strain of the supply chain and therefore reducing availability of required materials.

View