Client Background

UCS Renewables were contracted by McNally & Thompson on behalf of Gateshead Council to install a solar array to help achieve carbon targets for the local area. The installation at the car park was planned to be part of a series of installations to off-set the cities carbon emissions and achieve Net Zero targets by 2050.

The Challenge

Gateshead Multi-Storey Car Park (MSCP) is one of the most unique installations in the North East. From the outset this was an ambitious project from design to mechanical engineering and scale. The aim for this installation was to install the solar array without the support of a standard roof. The generated electricity would also need to partially offset the electricity used by the electric vehicle chargers within the car park.

Designers, structural engineers and solar specialists collaborated to come up with a supporting structure that created a unique mounting system that covered the full area of the 300 space car park. The completed installation is fully exposed above and below highlighting the engineering involved from nut and bolt, DC wiring and the energising panel.

What UCS Renewables Did

Our Energy team worked with the provided drawings from McNally & Thompson to compile a suitable design to maximise the use of the available space and optimise solar generation.

The installation was challenging as rising energy bills created a surge for solar installations increasing the strain of the supply chain and therefore reducing availability of required materials.

Over the course of 8 weeks our installation team overcame each hurdle constructing a large scale ‘mechano’ set installing 4618 components to support the panels – ensuring each panel was torque tested to ensure strength and stability.

  • 243kW System
  • 594 x 410w Solar Modules
  • 2 x 110kW Solis Inverters
  • Sun Fixing Mounting System
  • Solis API Cloud Monitoring

Get in Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567.

Or complete the form to contact UCS Renewables and we’ll get right back to you.

This field is for validation purposes and should be left unchanged.

Case Studies

Scout Hut, Bo’Ness – Charity Install

The Scout Hut were looking to achieve carbon neutrality. UCS Renewables technical team completed the Solar PV installation within three days across two elevations.

View

Greenbank, Hartlepool

UCS Renewables completed surveys of the building in addition to reviewing the provided energy efficiency report, to conclude that the roof was suitable for the installation of solar modules. A proposal was approved for SMEES funding for the installation of a 38kW array on a single flat roof.

View

Johnson Partners – Solar PV

UCS Renewables conducted a site survey to determine the material the roof was made of and the usable installation space. Shortly after we provided a competitive quotation. Upon the client’s acceptance of our quote, we issued all relevant paperwork to Northern Power Grid to gain approval to progress the installation. Shortly after receiving approval from the DNO we progressed the installation. Our installation was designed to generate an average of 6111kWh each year.

View