Northgate Hospital is part of Northumberland, Tyne & Wear NHS Foundation Trust. Mitford Unit is an autism inpatient unit located on the Northgate Hospital site and provides a specialist service for adults with an Autism Spectrum Disorder.

The Challenge

Mitford Unit required solar panels to harness the sun’s energy. They requested a large installation of solar PV (photovoltaic) panels.

What UCS Renewables Did

UCS Renewables installed 204 x 250w panels, giving an output of 51kWp. To meet sustainable code levels, the solar PV array had to reach an annual target of 42,000kwh per year, hence the need for 204 panels.

The panels are arranged over 4 roofs, in an aesthetically pleasing formation. They are positioned to avoid roof lights and vents. The mounting brackets we used are Schletter standing seam clamps and rails.

Due to the size of the array and additional solar panels on other buildings in the vicinity, Northern Power Grid insisted on a separate G59 relay in addition to the integrated G59/3 protection in the SMA inverters.

The panels generate plenty of power, even on overcast days, allowing the Mitford Unit to run efficiently and at a low cost. UCS Renewables also won the work to install the data cabling, TV work and CCTV at the unit.

Get in Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567.

Or complete the form to contact UCS Renewables and we’ll get right back to you.

This field is for validation purposes and should be left unchanged.

Case Studies

Scout Hut, Bo’Ness – Charity Install

The Scout Hut were looking to achieve carbon neutrality. UCS Renewables technical team completed the Solar PV installation within three days across two elevations.

View

Greenbank, Hartlepool

UCS Renewables completed surveys of the building in addition to reviewing the provided energy efficiency report, to conclude that the roof was suitable for the installation of solar modules. A proposal was approved for SMEES funding for the installation of a 38kW array on a single flat roof.

View

Gateshead MSCP

Our Energy team worked with the provided drawings from McNally & Thompson to compile a suitable design to maximise the use of the available space and optimise solar generation. The installation was challenging as rising energy bills created a surge for solar installations increasing the strain of the supply chain and therefore reducing availability of required materials.