Client Background

McNally and Thompson are an electrical contractor who approached UCS Renewables with the opportunity to provide a quotation for the installation of solar panels at the new AV Dawson head offices. The new premise is a short walk from UCS Renewables’ own office in Middlesbrough. Once completed, the building will feature rooftop terraces, office space, break-out rooms, a gym and employee training facilities.

The Challenge

Alongside the solar PV array, AV Dawson had a requirement for the installation of electric vehicle charging points. UCS Renewables provided a quote to McNally and Thompson for three dual pedestal Podpoint 7kW charging stations. This provides the capacity to charge up to six electric vehicles at any one point in time.

What UCS Renewables Did

UCS Renewables designed and installed a 30kWp renewable energy system that was composed of a Solis 30kW inverter alongside 82 solar modules. The electric vehicle charging points were installed simultaneously.

Get in Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567.

Or complete the form to contact UCS Renewables and we’ll get right back to you.

This field is for validation purposes and should be left unchanged.

Case Studies

Scout Hut, Bo’Ness – Charity Install

The Scout Hut were looking to achieve carbon neutrality. UCS Renewables technical team completed the Solar PV installation within three days across two elevations.

View

Greenbank, Hartlepool

UCS Renewables completed surveys of the building in addition to reviewing the provided energy efficiency report, to conclude that the roof was suitable for the installation of solar modules. A proposal was approved for SMEES funding for the installation of a 38kW array on a single flat roof.

View

Gateshead MSCP

Our Energy team worked with the provided drawings from McNally & Thompson to compile a suitable design to maximise the use of the available space and optimise solar generation. The installation was challenging as rising energy bills created a surge for solar installations increasing the strain of the supply chain and therefore reducing availability of required materials.