Client Background

Integral UK is a mechanical and electrical engineering contracting company that operates throughout the United Kingdom. They specialise in technical engineering services with a commitment to creating and maintaining sustainable buildings. Integral approached UCS Renewables in November 2020 with the opportunity to provide a quotation for the design and installation of a solar photovoltaic system at Berwick Leisure Centre. Berwick Leisure Centre is a new leisure facility in Berwick Upon Tweed, located near the former Swan Centre. The new building is scheduled for opening in Autumn 2021 with a 25m swimming pool, spa, fitness suite and seating areas. There is also a sports hall, sensory room, football pitch, play park and parking spaces within the grounds.

The Challenge

UCS Renewables provided four varied quotations for the project to suit the renewable energy requirements of the client and any required adjustments as the project progressed. UCS Renewables were awarded the contract in November 2020. The installation was completed in July 2021 based on the final submitted quote and associated design.

What UCS Renewables Did

UCS Renewables designed and installed an 84kWp system featuring two 40kW Solis inverters alongside 248 JA Solar panels. UCS Renewables also installed mesh underneath each panel to prevent birds from being able to access the electrical components and cause damage.

Get in Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567.

Or complete the form to contact UCS Renewables and we’ll get right back to you.

This field is for validation purposes and should be left unchanged.

Case Studies

Scout Hut, Bo’Ness – Charity Install

The Scout Hut were looking to achieve carbon neutrality. UCS Renewables technical team completed the Solar PV installation within three days across two elevations.

View

Greenbank, Hartlepool

UCS Renewables completed surveys of the building in addition to reviewing the provided energy efficiency report, to conclude that the roof was suitable for the installation of solar modules. A proposal was approved for SMEES funding for the installation of a 38kW array on a single flat roof.

View

Gateshead MSCP

Our Energy team worked with the provided drawings from McNally & Thompson to compile a suitable design to maximise the use of the available space and optimise solar generation. The installation was challenging as rising energy bills created a surge for solar installations increasing the strain of the supply chain and therefore reducing availability of required materials.

View