Close
Close

Get in Touch

Want to know what we can do for you? Please use this form to contact our team.



Or contact us directly

  • Telephone
  • Email
  • Menu

EO EV Charger

Client

Domestic Client - Luton

Sector

Domestic

Client

Domestic Client - Luton

Sector

Domestic

Client Background

Our client had browsed our online Shopify store and purchased an EO Mini 2 charger. Upon receiving the order, we contacted the client to ensure the charger was suitable for their charging requirements and proceeded to arrange installation.

Worker, framed

What UCS Renewables Did

After confirming the location of the installation, we arranged for an engineer to travel to Luton to install the EO charger. 

Prior to installation, we communicated with the client to help them apply for OLEV funding to reduce the final cost by £350! This client was eligible for OLEV funding as they met all of the designated criteria including:

  • Having an OLEV-eligible electric vehicle
  • Off-street parking
  • Installing an OLEV approved electric vehicle charger
  • Using an OLEV approved installer

This charger features untethered charging and can be controlled using your mobile to monitor electricity usage and control charging schedules. Additionally, should our client choose to install solar PV in the future, they can adapt their charger to use generated electricity to power their car!

Related Case Studies View All

Case Studies View All

View

The Curve, Teesside University

Working on behalf of local firm Castle Building Services, we installed 177 x 250w solar panels to generate clean, renewable energy. The panels were placed in an east-west configuration using a Renusol FS10 East/West mounting system to make use of the limited space available and ensure maximum exposure to the sun. The result is that the solar panels generate green electricity 365 days a year, providing a renewable energy source and allowing Teesside University to meet its sustainability targets.

View
View

Pulman Skoda Durham

UCS installed 80 solar panels onto the showroom’s roof. Working with Kingspan, we designed the layout of solar panels so that the array didn’t affect the integrity of the roof. We used drawings supplied by Kingspan and their standing seam brackets in the installation. The result was a roof of commercial solar panels carefully designed and installed to generate solar power for the showroom. The installation looks great and the building runs on solar energy, meaning low running costs for Pulman Skoda’s flagship showroom.

View

Get In Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567

Or complete the form to contact UCS Renewables and we’ll get right back to you.