The Challenge

Installation of 32 x 250w panels to cover 60m2.

Using Renusol Configuration tool, and PV Sol software the building was modelled and the layout design to cover 60m squared, as required by consultant. Due to the height of the building, and the city centre location the ballast required was over 400 blocks, which sit in the console bin underneath the panels. As there are two CHP units on site, a separate G59 Relay was installed which connects the Baxi CHP units with our electrical works.

Get in Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567.

Or complete the form to contact UCS Renewables and we’ll get right back to you.

This field is for validation purposes and should be left unchanged.

Case Studies

Scout Hut, Bo’Ness – Charity Install

The Scout Hut were looking to achieve carbon neutrality. UCS Renewables technical team completed the Solar PV installation within three days across two elevations.

View

Greenbank, Hartlepool

UCS Renewables completed surveys of the building in addition to reviewing the provided energy efficiency report, to conclude that the roof was suitable for the installation of solar modules. A proposal was approved for SMEES funding for the installation of a 38kW array on a single flat roof.

View

Gateshead MSCP

Our Energy team worked with the provided drawings from McNally & Thompson to compile a suitable design to maximise the use of the available space and optimise solar generation. The installation was challenging as rising energy bills created a surge for solar installations increasing the strain of the supply chain and therefore reducing availability of required materials.

View