Solar PV

Client

Domestic Client - Boosbeck

Sector

Domestic

Client

Domestic Client - Boosbeck

Sector

Domestic

Client Background

The client first contacted our office via telephone, within a few hours we compiled a solar PV quote to meet their energy needs and budget. In the same week, we conducted a site visit to confirm the client’s design and overall cost.

The Challenge

The client had an external canopy on their property and a satellite dish which required an additional scaffolding structure. We liaised with local scaffolding companies to construct a scaffolding solution to fit around these features. Our team were able to access the property's roof with minimal disruption.

Worker, framed

What UCS Renewables Did

The client confirmed their order in March 2021, we completed the agreed-upon system within the same month.

We designed and installed a solar PV system featuring ten Sunpower 400w panels alongside a Sunpower 3.6kW inverter with 10 optimisers.

Our client was given the opportunity to provide a review of our service via Check A Trade. They rated our installation and associated works as ten out of ten, followed by an online review and an appraisal of our engineers via email.

"The team was very nice and a pleasure to see the fast professional performance. The work was fast, clean and very neat with love for detail! We are so lucky to have such a supplier local! 10 out of 10!

Your team is very pleasant, risk-aware and it was a pleasure to see their teamwork. We certainly will recommend UCS Renewables!"

Related Case Studies View All

Case Studies View All

View

The Curve, Teesside University

Working on behalf of local firm Castle Building Services, we installed 177 x 250w solar panels to generate clean, renewable energy. The panels were placed in an east-west configuration using a Renusol FS10 East/West mounting system to make use of the limited space available and ensure maximum exposure to the sun. The result is that the solar panels generate green electricity 365 days a year, providing a renewable energy source and allowing Teesside University to meet its sustainability targets.

View
View

Pulman Skoda Durham

UCS installed 80 solar panels onto the showroom’s roof. Working with Kingspan, we designed the layout of solar panels so that the array didn’t affect the integrity of the roof. We used drawings supplied by Kingspan and their standing seam brackets in the installation. The result was a roof of commercial solar panels carefully designed and installed to generate solar power for the showroom. The installation looks great and the building runs on solar energy, meaning low running costs for Pulman Skoda’s flagship showroom.