Close
Close

Get in Touch

Want to know what we can do for you? Please use this form to contact our team.



Or contact us directly

  • Telephone
  • Email
  • Menu

Vulcan Street

Client

PD Ports

Sector

Commercial

Client

PD Ports

Sector

Commercial

Client Background

PD Ports are one of the UK's largest port groups operating over 13 locations throughout the United Kingdom. The Teesport location assists with international import and export movements from the North of England.

The Challenge

PD Teesport required the installation of electric vehicle chargers to service employee and client transport. Due to the nature of the charger placement and ground conditions, a wall-mounted bracket was chosen by the client in place of a stand-alone pole. 

Worker, framed

What UCS Renewables Did

UCS Renewables provided quotes for the project and we installed four EVBOX Business Line 7.4kW electric vehicle chargers with wall-mounted brackets. We also quoted and arranged for an annual invasive test to be conducted for each charger to ensure maximum performance. 

Key Features:

  • 4 x EVBOX Business Line 7.4kW Electric Vehicle Chargers
  • Type 1 to Type 2 Charging Leads
  • Wall-Mounted Brackets
  • Annual Invasive Maintenance Plan

Related Case Studies View All

Case Studies View All

View

The Curve, Teesside University

Working on behalf of local firm Castle Building Services, we installed 177 x 250w solar panels to generate clean, renewable energy. The panels were placed in an east-west configuration using a Renusol FS10 East/West mounting system to make use of the limited space available and ensure maximum exposure to the sun. The result is that the solar panels generate green electricity 365 days a year, providing a renewable energy source and allowing Teesside University to meet its sustainability targets.

View
View

Pulman Skoda Durham

UCS installed 80 solar panels onto the showroom’s roof. Working with Kingspan, we designed the layout of solar panels so that the array didn’t affect the integrity of the roof. We used drawings supplied by Kingspan and their standing seam brackets in the installation. The result was a roof of commercial solar panels carefully designed and installed to generate solar power for the showroom. The installation looks great and the building runs on solar energy, meaning low running costs for Pulman Skoda’s flagship showroom.

View

Get In Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567

Or complete the form to contact UCS Renewables and we’ll get right back to you.