Client Background
PD Ports are one of the UK’s largest port groups operating over 13 locations throughout the United Kingdom.
The Teesport location assists with international import and export movements from the North of England.
The Challenge
PD Teesport required the installation of electric vehicle chargers to service employee and client transport.
Due to the nature of the charger placement and ground conditions, a wall-mounted bracket was chosen by the client in place of a stand-alone pole.
What UCS Renewables Did
UCS Renewables provided quotes for the project and we installed four EVBOX Business Line 7.4kW electric vehicle chargers with wall-mounted brackets. We also quoted and arranged for an annual invasive test to be conducted for each charger to ensure maximum performance.
Key Features:
- 4 x EVBOX Business Line 7.4kW Electric Vehicle Chargers
- Type 1 to Type 2 Charging Leads
- Wall-Mounted Brackets
- Annual Invasive Maintenance Plan