Close
Close

Get in Touch

Want to know what we can do for you? Please use this form to contact our team.



Or contact us directly

  • Telephone
  • Email
  • Menu

Zappi EV Charger

Client

Domestic Client - Northallerton

Sector

Domestic

Client

Domestic Client - Northallerton

Sector

Domestic

The Challenge

Our client already had an existing solar PV solution installed, they wished to utilise the electricity produced by their array to power their electric vehicle. The Zappi charger was the ideal solution for their needs as it offers: Tethered 7kW Charger, Programmable Timer Function, Three Charging Modes: Eco, Eco+ and Fast and it utilises solar PV to charge EVs. The client chose a white casing to match the exterior wall of his home.

Worker, framed

What UCS Renewables Did

UCS provided a quote for the installation of a Zappi electric vehicle charger that would utilise the client's existing solar PV system.

The Zappi charger allows the client to charge their electric vehicle using energy generated by their solar PV system. The Zappi charger will automatically adjust charging times to suit energy generation and household energy usage. 

This particular charger offers three charging modes alongside a programmable timer function.

"UCS Renewables were very knowledgeable, responsive and friendly. They rapidly conducted the survey and installed the charger within 2 weeks. The installation went very smoothly. Fantastic service! The charger is helping me maximise the use of solar energy to charge my first electric car"        Domestic EV Installation Client, Northallerton



Related Case Studies View All

Case Studies View All

View

The Curve, Teesside University

Working on behalf of local firm Castle Building Services, we installed 177 x 250w solar panels to generate clean, renewable energy. The panels were placed in an east-west configuration using a Renusol FS10 East/West mounting system to make use of the limited space available and ensure maximum exposure to the sun. The result is that the solar panels generate green electricity 365 days a year, providing a renewable energy source and allowing Teesside University to meet its sustainability targets.

View
View

Pulman Skoda Durham

UCS installed 80 solar panels onto the showroom’s roof. Working with Kingspan, we designed the layout of solar panels so that the array didn’t affect the integrity of the roof. We used drawings supplied by Kingspan and their standing seam brackets in the installation. The result was a roof of commercial solar panels carefully designed and installed to generate solar power for the showroom. The installation looks great and the building runs on solar energy, meaning low running costs for Pulman Skoda’s flagship showroom.

View

Get In Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567

Or complete the form to contact UCS Renewables and we’ll get right back to you.