Coalville Leisure Centre

Client

T Clarke

Category

Commercial PV

Close

Get in Touch

Want to know what we can do for you? Please use this form to contact our team.

This field is for validation purposes and should be left unchanged.

Or contact us directly

UCS Icons01642 242567

UCS Iconsinfo@ucs-technologies.com

Client Background

T Clarke is a construction engineering company that operates throughout the United Kingdom, they invited UCS Renewables to provide a quotation for the design and installation of a solar panel system for the Coalville Leisure Centre. The system was part of a multi-million-pound project funded by Everyone Active and North West Leicestershire District Council to replace the existing Hermitage Leisure Centre. The new building will feature a 25m swimming pool with an additional learner pool, gym, cafe, sports hall/courts, spa facilities and soft play areas.

What UCS Renewables Did

UCS Renewables installed a 35kWp system compiled of a 30kW Solis inverter and 91 JA Solar modules.

Get in Touch

We would welcome the opportunity to chat about how we can help you get more from your project regardless of size or time frame. Whether you want a free, no obligation consultation or just a quick chat please give us a call on 01642 242567.

Or complete the form to contact UCS Renewables and we’ll get right back to you.

This field is for validation purposes and should be left unchanged.

Case Studies

Scout Hut, Bo’Ness – Charity Install

The Scout Hut were looking to achieve carbon neutrality. UCS Renewables technical team completed the Solar PV installation within three days across two elevations.

View

Greenbank, Hartlepool

UCS Renewables completed surveys of the building in addition to reviewing the provided energy efficiency report, to conclude that the roof was suitable for the installation of solar modules. A proposal was approved for SMEES funding for the installation of a 38kW array on a single flat roof.

View

Gateshead MSCP

Our Energy team worked with the provided drawings from McNally & Thompson to compile a suitable design to maximise the use of the available space and optimise solar generation. The installation was challenging as rising energy bills created a surge for solar installations increasing the strain of the supply chain and therefore reducing availability of required materials.

View